MIPS-equipped and eMTB-rated, Flowline SE sets the standard for safety within a modern, minimalist design, achieving a five-star safety rating from Virginia Tech. With 14 vents, an anti-microbial liner, and a Fidlock magnetic buckle system, Flowline SE is the workhorse of trail helmets.
- 3-Way adjustable screwless visor
- NTA-8776 certified for E-Bike usage
- MIPS B-Series Rotational Impact Brain Protection System
- Full 360-degree fit retention system with 3-way rear height adjustment
- 14 vents for maximum airflow
- Full wrap in-mold construction
- Extended Coverage MTB Trail Helmet
- Fidlock® Magnetic Buckle System
- Dual Density EPS for low and high-speed impacts
- Anti-microbial Quick Dry Premium Liner
- Side strap adjusters
- 5-Star Virginia Tech safety rating